Once a change has been made to templates, which of the following commands should a cloud architect use next to deploy an laaS platform?
Correct Answer:
D
After making changes to templates, a cloud architect should use thegit push command to deploy an IaaS platform. This command is used to upload the local repository content to a remote repository, making the new or changed templates available for the next deployment.References: Version control practices and commands, such as using git for IaaS template management, are covered under the best practices for cloud deployments in the CompTIA Cloud+ certification.
An organization's security policy states that software applications should not exchange sensitive data in cleartext. The security analyst is concerned about a software application that uses Base64 to encode credit card data. Which of the following would be the best algorithm to replace Base64?
Correct Answer:
B
AES (Advanced Encryption Standard) is the best algorithm to replace Base64 for secure data exchange. Base64 is an encoding method that is not secure by itself, as it's easily reversible. AES, on the other hand, is a widely used encryption standard that ensures data is protected and is not readable without the correct encryption key.References: Encryption standards and practices, including the use of AES for securing data, are essential knowledge in cloud security covered in CompTIA Cloud+.
An engineer made a change to an application and needs to select a deployment strategy that meets the following requirements:
• Is simple and fast
• Can be performed on two Identical platforms
Which of the following strategies should the engineer use?
Correct Answer:
A
The blue-green deployment strategy is ideal for scenarios where simplicity and speed are crucial. It involves two identical production environments: one (blue) hosts the current application version, while the other (green) is used to deploy the new version. Once testing is completed on the green environment and it's ready to go live, traffic is switched from blue to green, ensuring a quick and efficient rollout with minimal downtime. This method allows for immediate rollback if issues arise, by simply redirecting the traffic back to the blue environment.References: CompTIA Cloud+ material emphasizes the importance of understanding various cloud deployment strategies, including blue-green, and their application in real-world scenarios to ensure efficient and reliable software deployment in cloud environments.
A cloud administrator wants to provision a host with two VMs. The VMs require the following:
After configuring the servers, the administrator notices that during certain hours of the day, the performance heavily degrades. Which of the following is the best explanation?
Correct Answer:
C
Given the provided table, the VMs have been allocated 2GB of RAM each, which may be insufficient for their workload, especially during peak hours which could lead to performance degradation. Insufficient RAM can cause the VMs to use swap space on disk, which is significantly slower and can lead to poor performance. References: CompTIA Cloud+ Certification Study Guide (Exam CV0-004) by Scott Wilson and Eric Vanderburg.
Which of the following will best reduce the cost of running workloads while maintaining the same performance? (Select two).
Correct Answer:
CD
The Reserved resources model offers cost savings for committed use over a long term, which can reduce costs while maintaining performance for predictable workloads. The Spot instance model allows users to take advantage of unused capacity at lower prices, offering significant cost savings, though with the possibility of instances being terminated when demand rises. Both models can be strategically used to optimize costs without compromising performance.