A product owner new to the role is very enthusiastic about an agile protect with an energetic team. What should be done first to ensure successful delivery of the product?
Correct Answer:
A
An agile team delivered a feature in the last iteration. The product owner, who missed the planning and review meetings, was dissatisfied with the feature. The team conducted a retrospective and reviewed the user stories related it.
What should the agile team do next?
Correct Answer:
A
What can an agile team use to prioritize stones?
Correct Answer:
C
The scrum master for a large project must provide an estimate of what can be delivered in six months. What should the scrum master do?
Correct Answer:
D
Team A is working on the second sprint of a product release Team B. which is an interdependent team located on the same floor requires extensive and frequent information to complete its sprint goal What should the agile team lead do?
Correct Answer:
A