- (Topic 4)
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution. NOTE: Each correct selection is worth one point.
Correct Answer:
ACD
HOTSPOT - (Topic 7)
A bicycle manufacturer uses Dynamics 365 Supply Chain Management.
The manufacturer experiences a supply chain issue with a metal used to fabricate the wheel. Due to the issue, the manufacturer must change the bicycle wheel assembly temporarily. Production workers require an interactive visual guide to complete production.
You need to configure the features.
Which features should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Solution:
Does this meet the goal?
Correct Answer:
A
- (Topic 7)
You are the lead product design manage at a Process manufacturing plant.
A formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation. Which cost allocation type should you use?
Correct Answer:
D
- (Topic 7)
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
Break times are paid. The cost of a break time must be charged at the pay rate of the job in progress when the break starts.
You need to configure the break times to charge against the job in progress. Which two actions should you perform? Each answer presents a partial solution. NOTE; Each correct selection is worth one point.
Correct Answer:
AD
- (Topic 5)
You need to resolve the ModelA charging issue.
Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Correct Answer:
BC
