MB-335 Dumps

MB-335 Free Practice Test

Microsoft MB-335: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert

QUESTION 6

DRAG DROP - (Topic 7)
A manufacturing company uses Dynamics 365 Supply Cham Management The company operates three eight-hour shifts per day. Monday through Friday.
The company purchased equipment for a new process that cannot be performed with easting equipment. This specialized equipment performs only this unique task. The machinery must always be monitored and controlled by a worker.
The machine must be added to the existing production line and be ready as soon as possible. Future planned production orders must not overload the running maximums of the new machine.
You need to configure the system.
Which four actions must you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
MB-335 dumps exhibit
Solution:
MB-335 dumps exhibit

Does this meet the goal?

Correct Answer: A

QUESTION 7

DRAG DROP - (Topic 7)
A manufacturer uses route operations and job scheduling. You use a unique calendar for a conveyor line.
The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.
You need to adjust the efficiency percentage for the conveyor line calendar.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
MB-335 dumps exhibit
Solution:
MB-335 dumps exhibit

Does this meet the goal?

Correct Answer: A

QUESTION 8

DRAG DROP - (Topic 7)
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source. Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed. Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
MB-335 dumps exhibit
Solution:
MB-335 dumps exhibit

Does this meet the goal?

Correct Answer: A

QUESTION 9

DRAG DROP - (Topic 7)
A company uses multiple Dynamics 365 applications to track and repair equipment.
The company wants to improve its repair order process. Repair technicians frequently encounter unexpected issues daily. The technicians must be empowered to address the issues and create new work orders by doing the following:
• Provide step-by-step, just-in-time training for work order completion in the field by using videos and text.
• Document work order creation in a single, printable document.
• Report on the use of hands-on training.
You need to implement a solution forth requirements.
Which solution should you implement for each requirement? To answer, drag the appropriate solutions to the correct requirements. Each solution may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
MB-335 dumps exhibit
Solution:
MB-335 dumps exhibit

Does this meet the goal?

Correct Answer: A

QUESTION 10

- (Topic 7)
A company has a Dynamics 365 Supply Chain Management implementation. The company plans a promotional sales campaign that targets top customers.
The sales campaign will guarantee that orders are delivered within a specific two-week period.
The system configuration must prioritize a group of similar production orders so they can be scheduled at the same time.
You need to configure the system. What should you create?

Correct Answer: A