DCDC-003.1 Dumps

DCDC-003.1 Free Practice Test

BICSI DCDC-003.1: BICSI Data Center Design Consultant (DCDC)

QUESTION 21

What is the minimum distance recommended between a data center's backup generator and the main data center building?

Correct Answer: C

QUESTION 22

What is the difference between a hot aisle and a cold aisle containment system?

Correct Answer: A

QUESTION 23

How do you calculate thermal load in a data center?

Correct Answer: E

QUESTION 24

According to NEB, what is the recommended rate of temperature change per hour in a data center?

Correct Answer: C

QUESTION 25

What's conservative' hydrogen maximum flow rate per minute for battery.

Correct Answer: B