Your organization is planning for a periodic counting of individual items automatically throughout the course of the year. As part of this activity, the user has loaded items to the cycle count but some of the items are not being considered when count schedules and count sequences are not generated.
Identify two reasons that explain why the items are not being considered.
Correct Answer:
DE
Which two tasks must be defined to a set up the Facilities Schedule? (Choose two.)
Correct Answer:
AE
Your customer wants to transfer material from facility A to facility B. They are using the interorganization transfer to perform the transaction in the system. Their requirement is “whenever material is transferred from their facility A to facility B, facility B needs to pay 5
Correct Answer:
D
Your organization has lot controlled and nonlot controlled material and stores all defective material in a subinventory called “Defect”. The organization does not want defective material to be available for reservations or for subsequent shipping to customers.
Which option satisfies this requirement?
Correct Answer:
D
Given the code fragment:<>
Correct Answer:
D