“A calculated time frame that matches customer demand” is a definition of what Lean Principles term?
Correct Answer:
C
Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis?(Note:There are 2 correct answers).
Correct Answer:
AC
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?
Correct Answer:
C
A(n) ______ has occurred when two inputs have a greater impact on a change in the output than either of the inputs has by itself.
Correct Answer:
C
On a ______ a Belt screens variables, or various inputs, to analyze their relative impact on the output of concern.
Correct Answer:
C